Dear Lech Kulikowski,
The attached one is my report design in stimulsoft Designer.
Have 3 parameters and created variables only for those and deactivated Portfoliodata variable and getting the error while previewing.
Regards,
Veera
Search found 9 matches
- Mon Oct 17, 2022 1:23 pm
- Forum: Stimulsoft BI Designer
- Topic: Error in preview
- Replies: 7
- Views: 20698
- Mon Oct 17, 2022 5:09 am
- Forum: Stimulsoft BI Designer
- Topic: Error in preview
- Replies: 7
- Views: 20698
Re: Error in preview
Dear Lech Kulikowski,
Thanks a lot for your prompt response.
In my report,don't need the Portfoliodate parameter hence removed.
I have date range(from Date and To Date).
Regards,
Veera
Thanks a lot for your prompt response.
In my report,don't need the Portfoliodate parameter hence removed.
I have date range(from Date and To Date).
Regards,
Veera
- Fri Oct 14, 2022 6:10 am
- Forum: Stimulsoft BI Designer
- Topic: Error in preview
- Replies: 7
- Views: 20698
Re: Error in preview
Dear Lech Kulikowski, While designing the report in designer getting the below error. Must Declare the scalar variable "@Portfoliodate even that variable is not required. Back Ground: Have stored procedure with columns and parameters,retrieved all the details and added new parameters as FromDat...
- Tue Sep 06, 2022 12:54 pm
- Forum: Stimulsoft BI Designer
- Topic: Pie Chart
- Replies: 11
- Views: 22449
Re: Pie Chart
Dear Max Shamanov,
Please find the attachment contains the details.
Hope the details will be suffice.
Regards,
Veera
Please find the attachment contains the details.
Hope the details will be suffice.
Regards,
Veera
- Tue Sep 06, 2022 6:34 am
- Forum: Stimulsoft BI Designer
- Topic: Pie Chart
- Replies: 11
- Views: 22449
Re: Pie Chart
Dear Lech Kulikowski,
Please find the attached chart contains the details, while executing the report the data showing as 4%- Equity: Mid Cap Fund twice instead of 8% Equity: Mid Cap Fund.
Regards,
Veera
Please find the attached chart contains the details, while executing the report the data showing as 4%- Equity: Mid Cap Fund twice instead of 8% Equity: Mid Cap Fund.
Regards,
Veera
- Mon Sep 05, 2022 12:52 pm
- Forum: Stimulsoft BI Designer
- Topic: Pie Chart
- Replies: 11
- Views: 22449
Re: Pie Chart
Dear Lech Kulikowski,
Currently using Stimulsoft Designer 2022.3.3 version and not able to find the Data Transformation of the provided solution.
Kindly let me know on the same.
Regards,
Veera
Currently using Stimulsoft Designer 2022.3.3 version and not able to find the Data Transformation of the provided solution.
Kindly let me know on the same.
Regards,
Veera
- Tue Aug 09, 2022 9:04 am
- Forum: Stimulsoft BI Designer
- Topic: Pie Chart
- Replies: 11
- Views: 22449
Re: Pie Chart
Dear Lech Kulikowski,
Kindly share me sample snapshot if available for the same to perform the activity.
Thanks a lot.
Regards,
Veera
Kindly share me sample snapshot if available for the same to perform the activity.
Thanks a lot.
Regards,
Veera
- Fri Aug 05, 2022 1:15 pm
- Forum: Stimulsoft BI Designer
- Topic: Pie Chart
- Replies: 11
- Views: 22449
Re: Pie Chart
Dear Lech Kulikowski, Thanks a lot for your prompt response,using stimulus designer software and while creating pie chart report the scheme type of same details are not summing instead of capturing individual data. Ex: Have scheme Type: XXXXX Under the above scheme type had two schemes with values e...
- Fri Aug 05, 2022 10:28 am
- Forum: Stimulsoft BI Designer
- Topic: Pie Chart
- Replies: 11
- Views: 22449
Pie Chart
Dear Team,
I created a pie chart with values and fetching the results but the chart is developed on Scheme type.
The generated chart contains same scheme name but not capturing individual instead of sum.
Kindly let me know on how to resolve the issue?
I created a pie chart with values and fetching the results but the chart is developed on Scheme type.
The generated chart contains same scheme name but not capturing individual instead of sum.
Kindly let me know on how to resolve the issue?