Hello,
I am experiencing the error message in the subject line when I try and run my report. My code is below.
{Sum(((((((double)columnA + (double)columnb + (double)columnc + (double)columnd + (double)columne) * 27.0) *84.9) / 2000.0) * 39.75) + columnf)}
The conversion of each column to double is required because I cannot multiply an int by a double. Any help would be appreciated. Thanks
Error Number: CS1513 Error Text: } expected
-
- Posts: 6245
- Joined: Tue Mar 20, 2018 5:34 am
Re: Error Number: CS1513 Error Text: } expected
Hello,
Please send us a sample report with test data that reproduces the issue for analysis.
Thank you.
Please send us a sample report with test data that reproduces the issue for analysis.
Thank you.