changing stimulsoft
Posted: Mon May 11, 2015 5:41 am
hi i change my stimul soft 2010 to version 2014 and now when i open my project i faced with this errors
Error 5 The project currently contains references to more than one version of Stimulsoft.Report, a direct reference to version 2010.1.700.0 and an indirect reference (through 'Stimulsoft.Report.Viewer.StiViewerControl') to version 2014.3.0.0. Change the direct reference to use version 2014.3.0.0 (or higher) of Stimulsoft.Report.
what can i do
thanks
Error 5 The project currently contains references to more than one version of Stimulsoft.Report, a direct reference to version 2010.1.700.0 and an indirect reference (through 'Stimulsoft.Report.Viewer.StiViewerControl') to version 2014.3.0.0. Change the direct reference to use version 2014.3.0.0 (or higher) of Stimulsoft.Report.
what can i do
thanks