A significant percentage of the work on the reports was performed prior to the start of this project. I adore them, and stimulsoft's service is fantastic.
However, I would like to know if the reports have been made available as a Visual Studio resource. They can be upgraded asynchronously using our method, but they do require dataset revisions for content changes, thus I believe they should be included in the executable package. Is it possible to do this, or must the report's path be a file?
Using Reports as Resources
-
- Posts: 7333
- Joined: Tue Mar 20, 2018 5:34 am
Re: Using Reports as Resources
Hello,
You can store reports as you need - file, string, arrays, in the database, etc.
Thank you.
You can store reports as you need - file, string, arrays, in the database, etc.
Thank you.