Hello,
I have a report with a databand for displaying a calendar: 7 days as columns und multiple weeks as rows. If, for example, the wednesday has a lot of data, then the line breaks to the next page. Although "Can Break" is False. What can I do to ensure that the row does not break?
Please find attached some files (mrt, test project, pdf).
Thank You.
Calendar week breaks
Calendar week breaks
- Attachments
-
- StimulTest.zip
- (129.94 KiB) Downloaded 181 times
-
- out.pdf
- (100.86 KiB) Downloaded 243 times
-
- Dienstplan.mrt
- (12.91 KiB) Downloaded 261 times
Last edited by Bold on Tue Oct 27, 2015 1:24 pm, edited 2 times in total.
Re: Calendar week breaks
Hello,
Can you please send us your report template with test data for analysis.
Thank you.
Can you please send us your report template with test data for analysis.
Thank you.
Re: Calendar week breaks
I added a test project, the mrt and the new result pdf. I hope this is useful.
Best regards
Henry
Best regards
Henry
Re: Calendar week breaks
Hello.
Please, try to add DataBand with panel on each day of week instead of columns. Then there be not such issue.
Thank you.
Please, try to add DataBand with panel on each day of week instead of columns. Then there be not such issue.
Thank you.
Re: Calendar week breaks
Thank you, this solved my problem.
Re: Calendar week breaks
Hello,
Please contact us if you need any help!
Thank you.
Please contact us if you need any help!
Thank you.